J'ai postulé en ligne. Le processus a pris 2 jours. J'ai passé un entretien chez Evertz Microsystems (Burlington, ON) en juill. 2012
Entretien
First interview with HR was over the phone. I was then called for a second interview.
The second interview consisted of meeting with a person in HR as well as the Mechanical Design Director. There was also a technical test,