Le processus a pris 1 jour. J'ai passé un entretien chez Texas Instruments (Dallas, TX) en déc. 2011
Entretien
I had an telephonic interview on November first week,though I thought it went well, 10 days later I was told that I have not been selected. 1 month after this I was called by the manager and was told they want me to be interviewed 1 week later and they will send me the schedule I was amazed but was happy that I have a chance, 2 days passed but wasn't given any schedule, there was lots of ups and downs during this interview. As I was promised for schedule which I never got instead I was told that I have to present something/anything 3 days before, which I prepared hurriedly. Interviews were very good and all the interviewers were very nice and friendly. Except the presentation, I feel everything went good.
Told to design a layout through a very slow laptop, be prepared. asked about parasitics in layout design, and effect of high voltage on MOS and what should you do.
J'ai postulé via un recruteur. Le processus a pris 2 mois. J'ai passé un entretien chez Texas Instruments
Entretien
Forwarded my resume to a HR team. Got a phone call in 2 weeks which was the first round of phone interview. Went for an onsite interview within a month. Had 5 rounds of interview from 9AM to 3PM. Purely technical.
Got a call back 1 month after the interview with the offer to join TI.
Questions d'entretien [1]
Question 1
Questions regarding library creating and area of the cells in the library
J'ai postulé via un recruteur. Le processus a pris 6 semaines. J'ai passé un entretien chez Texas Instruments
Entretien
Had two phone interviews followed by an onsite interview. Onsite interview lasted from 9AM to 3PM (5 rounds and a panel interview). The whole process was very organized and professional.
Questions d'entretien [1]
Question 1
Previous challenges as a physical design engineer, lot of questions about the .libs and encounter commands.