J'ai postulé via un établissement d'enseignement supérieur ou universitaire. Le processus a pris 3 semaines. J'ai passé un entretien chez Mitchell International (La Jolla, CA) en avr. 2017
Entretien
The first step was a take-home coding assignment that was estimated to take around 2-3 hours long. Immediately after that were two 30-minute onsite interviews 1:1 with engineers. The last interview was a quick behavioral screening with an HR rep.
Questions d'entretien [1]
Question 1
Develop a database system for several types of vehicles along with methods to insert, delete, find, etc.