J'ai postulé en ligne. Le processus a pris 4 mois. J'ai passé un entretien chez John Deere (Greensboro, NC) en nov. 2019
Entretien
Got a phone interview after one month of applying for the job. one month after that had in-person interview in North Carolina. I had 2 interviews scheduled on the same day, one from 8-9 and other 9-10 with two different set of people, but nobody showed up until 9. 15 AM. After the first interview, the same questions were asked in the second interview over a video conference call. I had a return flight at 12.30 pm. And I was still in the interview till 11.30. I felt very unprofessional.
Questions d'entretien [1]
Question 1
tell me about a time you had to be very strategic in order to meet all your top priorities
J'ai postulé en ligne. Le processus a pris 6 semaines. J'ai passé un entretien chez John Deere (Monterrey, Nuevo León) en nov. 2023
Entretien
The interview process was fairly smooth, consisting of three separate interviews: one with HR, one with the team manager, and one with the department manager. The interviews included a mix of technical and general questions, with half of them were in english
J'ai postulé en ligne. J'ai passé un entretien chez John Deere (Dubuque, IA)
Entretien
One of the nicest interview processes I’ve had. Flew me out all paid for three days. The interview itself was 2x back to back panels that asked the same 5 technical STAR questions. Then they took me to lunch, gave me a factory tour, and a tour of the city.
J'ai postulé en ligne. Le processus a pris 4 semaines. J'ai passé un entretien chez John Deere (Moline, IL) en oct. 2023
Entretien
STAR interview
5 questions with one panel of two people followed by 5 similar questions with another panel of two people.
You will have a question about diversity so have an answer ready.
Questions d'entretien [1]
Question 1
Tell us about a time you worked with someone from a different background