J'ai postulé en personne. Le processus a pris 1 jour. J'ai passé un entretien chez KBR (Ingleside, TX) en mai 2013
Entretien
had to take a welding test.a 6in pipe with 6010 5p+ root and hot pass then with 3/32 7018 lo/hi filler and cap. then a 2in pipe with E70S rod root and 3/32 hot pass then with E70S rod filler and cap. both test where at a 6G postion